Industrial & manufacturing
Kishwaukee Foods Cold Storage Expansion
A 340,000 sq ft cold storage and blast-freeze expansion built alongside a plant that never stopped shipping.
DELIVERED 3 WEEKS EARLY
Industrial & manufacturing
Kishwaukee Foods Cold Storage Expansion
A 340,000 sq ft cold storage and blast-freeze expansion built alongside a plant that never stopped shipping.
DELIVERED 3 WEEKS EARLY
Client
Kishwaukee Food Group
Location
DeKalb, IL
Completed
2025
Duration
19 months
Area
340,000 sq ft
Contract value
$50M+
Delivery
Design-Build
Architect
Feld & Ostrander Architects
Client
Kishwaukee Food Group
Location
DeKalb, IL
Completed
2025
Duration
19 months
Area
340,000 sq ft
Contract value
$50M+
Delivery
Design-Build
Architect
Feld & Ostrander Architects
The challenge
The existing plant ran three shifts, seven days a week. Any tie-in longer than a scheduled sanitation window would have cost the owner more than the building itself.
What we did
We phased every tie-in across eleven sanitation windows, pre-assembled the refrigeration racks off site, and kept a dedicated night superintendent on the connection work from first cut to final balance.
The challenge
The existing plant ran three shifts, seven days a week. Any tie-in longer than a scheduled sanitation window would have cost the owner more than the building itself.
What we did
We phased every tie-in across eleven sanitation windows, pre-assembled the refrigeration racks off site, and kept a dedicated night superintendent on the connection work from first cut to final balance.
Outcome
Outcome
Day 11
GMP issued
0 hours
Production downtime
1.2% of GMP
Change orders
Day 11
GMP issued
0 hours
Production downtime
1.2% of GMP
Change orders